NFL — Desktop Refresh Across 5 Plants

IT hardware refresh for National Fertilizers Limited across five manufacturing plants, coordinating simultaneous deployment at geographically distributed industrial facilities.

Energy & Industrial

Challenge

NFL needed to refresh aging desktop infrastructure across five plants located in different states. Industrial plant environments present constraints around access scheduling, safety protocols, and minimal disruption to plant operations during deployment windows.

Solution

MITS coordinated parallel deployment teams across all five NFL plant locations, supplying and installing 439+ desktop workstations with consistent configuration and asset documentation. Deployment schedules were aligned to plant maintenance windows to avoid production impact.

Outcome

All five plants refreshed within the programme timeline. 439+ workstations commissioned and accepted across NFL's manufacturing operations.

Key Metrics

  • 5 plants covered
  • 439+ desktops deployed
  • Multi-state industrial rollout
  • Coordinated deployment windows